Product Details:
|
Material: | Steel Wire | Mesh Hole: | 50mm X100mm, 75mm X75mm, |
---|---|---|---|
Surface: | Zinc Coated | Wire: | 3.0mm-5.0mm |
Customise: | Acceptable | Life Duration: | ≥ 25 Years |
Highlight: | pvc coated gabion box,gabion rock wall cages |
Rust Proof Galfan Coated Welded Gabion Boxes In South Africa
SHUXIN Gabions is your reliable supplier of welded-wire gabion baskets, suited for both commercial and residential applications. Our Wire Mesh is zinc coated after welding, providing a superior quality that will protect the welds from corrosion and other outside elements.Gabions made of welded-wire offer greater strength then woven wire gabions, and still possess the same flexibility.
Details of welded gabion box :
- Material of welded gabion box:Galvanized wire
- Surface treatment:Electric galvanized.hot dipped galvanized,pvc coated
- Connect way of gabion box :by Helical wire,by U post,H post
- Packages:with pallet or as your request.
Nominal Box sizes ( m) | No. of diaphragms (no.) | Capacity per box (m3) |
1.0 × 1.0 × 0.5 | Nil | 0.50 |
1.0 × 1.0 × 1.0 | Nil | 1.00 |
1.5 × 1.0 × 1.0 | Nil | 1.50 |
2.0 × 1.0 × 0.5 | 1 | 1.00 |
2.0 × 1.0 × 1.0 | 1 | 2.00 |
3.0 × 1.0 × 0.5 | 2 | 1.50 |
3.0 × 1.0 × 1.0 | 2 | 3.00 |
4.0 × 1.0 × 0.5 | 3 | 2.00 |
4.0 × 1.0 × 1.0 | 3 | 4.00 |
Welded gabion box advantages:
How to install welded gabion box?
Step 1. Ends, diaphragms, front and back panels are placed upright on the bottom section of wire mesh.
Step 2. Secure panels by screwing spiral binders through the mesh openings in adjacent panels.
Step 3. Stiffeners shall be placed across the corners, at 300mm from the corner. Providing a diagonal bracing, and crimped over the
line and cross wires on the front and side faces. None are needed in interior cells.
Step 4. Gabion box filled with graded stone by hand or with a shovel.
Step 5. After filling, close the lid and secure with spiral binders at the diaphragms, ends, front and back.
Step 6. When stacking tiers of the welded gabion box, the lid of the lower tier may serve as the base of the upper tier. Secure with
spiral binders and add pre-formed stiffeners to exterior cells before filling with graded stones.
Contact Person: Julia
Tel: +86 177 3408 2565
Fax: 86-318-7020290