Product Details:
|
Material: | 0.5mm, 0.6mm, 0.8mm, 0.9mm Steel Wire, Strong | Wire Thickness: | 0.5 - 0.8 Mm |
---|---|---|---|
Brand Name: | HEBEI KN | Delivery Time: | 7 Days Per 40ft Container |
Surface Treatment: | Oil Protection, Water Proof Paper, Shrink Film | Product Name: | Low Visible Wire, Invisible Wire Mesh, MZP, MPP |
SIZE: | 10x10x1.1-1.4 Or 10x5x1.1-1.4m | Type: | More Grands |
MOQ: | 100 SET | Key Words: | Low-visibility Wire Mesh, MZP, MPP |
Sample: | Available | ||
Highlight: | Engineering Obstacles Anti-tank Wire Net,KN Anti-tank Wire Net,Anti-tank Wire Net |
KN Inconspicuous Steel Wire Tank Barrier Fence Engineering Obstacles Anti-tank Wire Net
Barely noticeable obstacle 10х10х1.4m is designed to
provide effective obstruction of movement and hinder the advancement of state border violators. It helps to create favorable conditions for blocking and detention of offenders by border patrols and reserves, as well as
restricts the impact of animals and people on signaling and control equipment.
These products are available for purchase with a
floor space of 100 m² and a set weight of up to 24 kg
Specification Size List of Low Visible Wire:
Open Size (M) | Weight (KG) |
10 x 10 x 1.1-1.4 | 30 -30.5 kg |
10 x 10 x 1.1-1.4 | 26.5 - 27 kg |
10 x 5 x 1.1-1.4 |
24.5 - 25 kg
|
Package:
(1) plastic film:the purpose is to waterproof and protect against moisture.
(2) in pallet:easy to handle and prevent deformation.
(3) in nude:the simplest and most affordable package.
(4) We have our own freight forwarding company and customs clearance company.customers can also specify the freight shipped by customs.
Package Protection:
a) Oil Protection: First step need to spray oil on the surface of Low Visible Wire Mesh.
b) Water Proof Paper: Second to use water proof paper to protect it
c) Shrink Film: Finally use shrink film to fasten it.
Accessories of Low Visible Wire Mesh:
a) rings
b) pegs = 9 peg or 7 peg
Workshop Show:
Following Picture is our No.1 workshop, with around 100 pcs production platform, can produce around 500 sets per day.
Installation Instruction:
Step-by-step instructions for installing a Low Visible Obstacle (LVO)
a): Place the coil in the right place Where it will be installed.
Important note: after deployment, the MZP is no longer assembled into the original coil. That is, it is necessary to take into account that it will no longer be possible to install it, and then assemble it back and move it to another place.
b): Divide the bay into two parts and lay them out in two directions. No need to cut anything.
c): Stretch two rows of the bay to their full length.
d) Lay each row outwards. Two rows will make four.
e): To fix the coil with nails, you need to fix it with a thick coil with nails.
By this move and stretch the bottom it will shows thick lines, thin lines will extend upward,after fix the outermost layer of coils.
Contact Person: Miss. Linda
Tel: +86 177 1003 8900
Fax: 86-318-7020290